1. Scraper loader is suitable for shoveling rock below Grade IV and soil with moderate moisture content, gravel and sand, and is especially suitable for site leveling with a large amount of earthwork and large-scale foundation pit filling and excavation projects. However, scraper loader is not suitable for occasions where the soil contains stones and debris and deep excavation operations. When used for frozen soil or soil above Grade IV, the soil must be loosened in advance. 
2. Site leveling operation. Site leveling operation should be carried out from the section with large height difference in the excavation and filling area first, and the high should be shoveled and the low should be filled. A standard strip is leveled in the middle of the site, and then gradually expanded outward from it.
3. Embankment filling operation. There are two construction methods for scraper embankment filling: longitudinal embankment filling and transverse embankment filling. The longitudinal filling should start from both sides of the embankment, and the transverse filling embankment can be constructed using a spiral running route. The operation method is the same as the longitudinal filling embankment.
4. Soil, gravel and sand shoveling operation. When using a scraper to load loose soil, the shovel should be deep and the bucket door should be opened wide. When shoveling sand, it is best to use a chain plate to load the scraper. 
5. Excavation of foundation pits and pipe trenches. When using a scraper to excavate foundation pits and pipe trenches, if the work site is large enough, an external ramp can be placed. If the construction site is relatively narrow, an internal ramp can be set up.